About us
Sustainability – Security – Development
We are a Technical Operation Company specializing in railway infrastructure. Our main goal is to help our customers achieve a sustainable investment in the future by providing excellent security and continuous development of solutions.
With more than ten years of experience, we provide engineering solutions, develop and implement construction projects (realization), as well as offer author supervision and construction supervision according to the customer’s wishes. In order to provide maximum value to the customer, we can undertake technical maintenance work and even the delivery of equipment/ materials to railway infrastructure objects.
One of our strengths is the individual approach to identifying the client’s situation – in-depth infrastructure research, analysis and technical support on our part.
Services
-
Development of construction projects
-
Realization of construction projects
-
Construction supervision
-
Delivery of equipment and materials
-
Construction project expertise
-
Railway infrastructure research, analysis and technical support
Projects
-
Construction of station of Krustpils attached railway access road SIA “PATA”
Customer – SIA “PATA”
Construction Contractor – SIA “TEK Baltic”
Total project funding – 3 million EUR
Participation in the project – full construction project realization and construction with equipment supply
Project description – total railway track length – 3214,3 m of which 1.6 km was intended to build on existing subgrade but the remaining – on new subgrade. Project includes such activities as construction of a railway crossing, reconstruction of signals interlocking systems network, construction of rainwater drainage system, reconstruction of water supply networks, reconstruction of electricity supply networks and construction of anti-noise solutions.
The contract on project implementation has been signed – 21.07.2021
The project is planned to be commissioned – 31.07.2025
-
Within the project “Modernization of railway passenger infrastructure” design elevated platforms on the railway line Zemitāni-Skulte (Zemitāni-Vecāķi, Alfa): Zemitāni, Brasam Sarkandaugava, Mangaļi, Ziemeļblāzma, Vecdaugava, Vecāķi, Dauderi, Alfa (Part 4)
Customer – VAS “Latvijas dzelzceļš”
General Contractor – “LEONHARD WEISS” ÖU
Total project funding – 6,929 million EUR
Participation in the project – full project development (9 stations/stopping points)
Project description – project “Modernization of railway passenger infrastructure” 4th part includes designing and construction of 9 railway stations and stopping points (hereinafter – stations or crew stations). The project is funded by the EU Cohesion Fund and state budget as well as implemented in accordance with FIDIC “Conditions of Contract for Plant and Design-Build”, First edition 1999.
The contract on project implementation has been signed – 03.08.2021
The project is planned to be commissioned – 30.11.2024
-
Installation of fences and pedestrian crossings in railway infrastructure facilities
Customer – “LEONHARD WEISS” ÖU
Total project funding – 4 million EUR
Participation in the project – project development (17%)
Project description – within the framework of the construction project, a pedestrian bridge over the tracks at the station “Šķirotava”, installation of fencing and pedestrian crossings in railway infrastructure objects is planned: design.
The project is planned to be commissioned – The project was stopped
-
Replacement of 10kV cable power lines for the traction substation “Zasulauks” in the Ventspils street area, Riga
Customer – VAS “Latvijas dzelzceļš”
General Contractor – SIA “TEK Baltic”
Total project funding – 489 715.00 EUR
Participation in the project – full construction project realization and construction with equipment supply
Project description – total railway track length – 3214,3 m of which 1.6 km was intended to build on existing subgrade but the remaining – on new subgrade. Project includes such activities as construction of a railway crossing, reconstruction of signals interlocking systems network, construction of rainwater drainage system, reconstruction of water supply networks, reconstruction of electricity supply networks and construction of anti-noise solutions.
The time specified in the contract for putting the facility into operation – 23.10.2024
The actual time for putting the facility into operation – 11.06.2024 (4 months before the deadline)
-
Modernization and development of the electrified railway network: construction
Customer – VAS “Latvijas dzelzceļš”
Contractor – PS “NORDES BŪVE & TEK”
Total project funding – 58.69 million EUR
Participation in the project – full construction project realization and construction with equipment supply
Project description – Design and construction of a new 99 km catenary system network and related systems in the directions:
-
-
- Riga Passengers – Zemitani
- Zasulauks – Bolderaja
- Zasulauk – Sloka
-
The contract on project implementation has been signed – 28.02.2024
The project is planned to be commissioned – January 30, 2026
Partners of cooperation
VAS “Latvijas dzelzceļš”
PS “NORDES BŪVE & BCC”
PS “NORDES BŪVE & TEK”
“LEONHARD WEISS” ÖU
SIA “ATEF-Latvia”
SIA “Vincents”
SIA “PATA”
AS ENERGOFIRMA “JAUDA”
SIA “Energokomplekss”
SIA “TESLA”
SIA “Delta EM”
SIA “Rail Balt”
SIA “RECK”
SIA “Ceļu Būvnieks”
SIA “Aleks Celtnieks”
Contact information
Phone: +371 29103045
E-mail: info@tekbaltic.lv
Legal address: Karla Ulmana alley 114A, Riga, LV-1029, Latvia
Office address: Skanstes street 50, 1.entrance, Riga, LV-1013, Latvia
Requisites
TEK Baltic Limited Liability Company
Registration No.: 40103332064
VAT Registration No.: LV40103332064
Address: Karla Ulmana alley 114A, Riga, LV-1029, Latvia
Bank: Rietumu Bank AS
Bank account: LV11RTMB0000701801093 ISO
ISO 9001:2015 Kvalitātes pārvaldības sistēmas. Prasības.
ISO 9001:2015 Quality management systems – Requirements.
ISO 14001:2015 Vides pārvaldības procesi tiek veikti atbilstoši ISO